EXECUTIVE SUMMARY
At over 200 days, the 2026 Jones Act waiver is the longest in modern history and is currently set to expire in mid-November. Critics argue that the waiver has harmed the U.S. maritime industry, by diverting voyages that could have been completed by Jones Act tankers. Balsa tested whether U.S.-flag vessels were available for Jones Act waiver voyages using AIS data on all 56 Jones Act tankers (from April 27, 2026) and 96 articulated tug barges (ATBs; from July 1, 2026). A vessel was counted as “available” only if it was near the port of loading, could potentially carry the waiver cargo, and could make the voyage without disrupting its existing schedule.
Using waiver voyage data reported no later than October 5 by U.S. Department of Transportation’s Maritime Administration (MARAD), it was determined that a U.S.-flag vessel was available for only 5% of waiver voyages during the periods covered by Balsa’s tanker and ATB data. Furthermore, Jones Act tankers and ATBs showed no unusual idleness and sailed consistent routes.
The analysis does not support the claim that U.S.-flag vessels could have carried waiver cargo on a majority of waiver voyages.
OVERVIEW
At over 200 days, the 2026 Jones Act waiver is the longest continuous waiver in modern history. Having been extended twice, it is currently set to expire in mid-November 2026. As of October 5, a total of 296 waiver voyages have been reported by the U.S. Department of Transportation’s Maritime Administration (MARAD) for the entire waiver period. At least twelve unreported waiver trips have been independently documented since July. Critics of the waiver consistently point to its negative impact on the U.S. maritime industry, arguing for the availability of U.S. vessels to make these voyages. The American Maritime Partnership (AMP) estimated in June that Jones Act tankers, ATBs, and barges were available for 87% of waiver voyages. This figure prompted Balsa to investigate further. If Jones Act tankers had been available for most waiver voyages, the waiver should have pulled business away from them, showing up as idle time or changed routes. Yet Balsa’s earlier operational analysis found no change in Jones Act tanker routes during the waiver period compared to the period before it.
While MARAD provides reports of these waiver voyages, there are no detailed reports of U.S.-flag vessel availability, nor was an assessment even required until the waiver extension that began on August 17. This second and most recent waiver extension, limits the types of cargo that ships can carry and creates a new approval process, which requires MARAD to determine whether a Jones Act-eligible ship or articulated tug barge (ATB) is available before approving a waiver.
Under the MARAD reporting requirements for all waiver periods, waiver vessels are required to provide an “Explanation of National Defense Interest”. Notably, at least 33 waiver vessels listed “Not Applicable” in that column.
However, in their Explanation of “National Defense Interest”, several waiver vessels have noted the lack of Jones Act tankers in the U.S. fleet. Ten waiver vessels reported “Non-availability of U.S.-flag vessels” in their explanation while several others cited “The limited availability of Jones Act tonnage”.* One vessel noted the lack of any available Jones Act LPG carriers, reporting:
Separately and independently, there is presently no Jones Act–qualified vessel — U.S.-built, U.S.-owned, and U.S.-crewed — operating in the LPG carrier segment; this is not a temporary or route-specific shortage but a structural absence of the vessel type from the coastwise-qualified fleet, which MARAD's market survey is expected to confirm. Propane is an essential fuel for Puerto Rico's residents and critical infrastructure, including cooking, water heating, and backup power generation for hospitals and water treatment facilities, and this shipment is being made during the Atlantic hurricane season, when the island's import logistics and supply buffers are most vulnerable to disruption. This transportation does not displace any Jones Act–qualified carrier or route and represents additive capacity necessary to maintain continuity of an essential fuel supply to the U.S. territory of Puerto Rico. [emphasis added]
Bloomberg has reported that vessels MARAD deems “available” under the new approval rules are often too small, requiring multiple voyages that fall outside the window requested by the shipper.
* “Limited access to qualified Jones Act tanker capacity reduced the ability to reposition Gulf Coast diesel supplies to the Northeast within the required timeframe, increasing the risk of inventory shortfalls and supply disruptions in a critical regional fuel market.”
METHODS
Jones Act-eligible tankers were identified from MARAD’s list of U.S. Flagged Vessels from March 2026. The list is made up of self-propelled, privately owned U.S.-flag vessels of 1,000 gross tons and above, and marked vessels as “Jones Act Eligible”. This analysis tracked the movement of the 56 Jones Act-eligible tankers and excluded general cargo vessels as the waiver has been limited to energy products. All tankers were then tracked in VesselFinder.
Four months into the waiver period, Balsa began data collection on ATBs to fill the data gap in analysis on the impacts of the waiver on U.S. vessels, as ATBs make up a significant portion of waterway transport in the United States. Recent criticism of Jones Act waiver analyses has highlighted that ATBs are ignored, despite their importance to coastwise trade. Accordingly, Balsa identified a list of ATBs from the following sources:
MARAD’s 2015 list of U.S.-Flag Integrated and Articulated Tug-Barge Units (ITB/ATB). This list also includes the barge(s)* usually paired with a tug.
Crowley’s published fleet list of 17 ATB tugs across its 550, 650 and 750-series classes. Each tug’s IMO number was checked against the numbering of the rest of its class. Crowley also lists barges.
Operator fleet lists. For example, Reinauer and Moran ATB tugs came from those operators’ own fleet pages. For Reinauer, ATB tugs were told apart from its conventional tugs by horsepower, following the company’s own description of its fleet as 2,000–3,000 HP conventional tugs and ATB units of up to 7,200 HP.
This amounted to a total of 123 vessels. These vessels were then tracked in VesselFinder, and those that visited an oil terminal two or more times were included in this analysis, bringing the number of ATB tugs to 96. See the list of vessels here.
Balsa has records of the entire Jones Act tanker fleet starting on April 27, 2026 and records of all 96 ATBs starting on July 1, 2026.** Data for both fleets runs through September 29, 2026.*** MARAD publishes reports of Jones Act waiver voyages and all voyages reported on or before October 5, 2026 were used for analysis.
The AIS data of the Jones Act tankers and ATBs were then compared to the waiver voyages reported by MARAD, which specify the port of loading and unloading per voyage.
In order for a Jones Act tanker or ATB to be considered “available” the following criteria had to be met:
The Jones Act tanker or ATB needed to be in the vicinity to pick up the cargo (the “Facility of loading” in the MARAD data).
The Jones Act tanker or ATB needed to be able to carry the amount of cargo reported by the waiver vessel.
The Jones Act tanker or ATB needed to be potentially capable of carrying the type of cargo reported by the waiver vessel to MARAD.
The Jones Act tanker or ATB needed to be able to complete the journey made by the waiver vessel without affecting its other scheduled voyages.
The following assumptions were made:
It was assumed that Jones Act tankers and ATBs operate under long-term contracts with fixed schedules, and that a waiver voyage could not disrupt those schedules.
It was assumed that crew were ready and able to man either the Jones Act tanker or ATB.
It was assumed that Jones Act tankers and ATBs could travel at their average speed (i.e., weather-related delays were not factored into the analysis).
*Barges cannot be tracked separately with AIS data, as they are not self-propelled, but tugboats are regularly paired with the same barge or set of barges.
**Individual vessels may have data that dates earlier, as VesselFinder limits available data to the last 15 port stops.
***Because of the delay in reporting, these records all report voyages before September 29, 2026.
RESULTS
As of October 5, 2026, MARAD reported 254 waiver voyages during the period that Balsa collected data for the Jones Act tankers, and 99 waiver voyages during the period of data collection on the ATB fleet (Table 1). During this period, there were five instances (2% of waiver voyages) identified where a Jones Act tanker may have been available to complete a waiver trip. There were five instances (5% of waiver voyages) identified where an ATB may have been available to complete a waiver trip.
The Jones Act tankers did not experience unusual levels of inactivity through the course of the waiver period. While several Jones Act tankers spent 20+ days in port, they were located in dry docks in the Bahamas, likely undergoing repair. Regarding ATBs, seven had periods of 10 or more days in port, for unknown reasons. These periods of idleness account for just two instances where an ATB may have been available.
| Jones Act Tankers | ATB fleet | |
|---|---|---|
| Fleet data available from | April 27, 2026 onward | July 1, 2026 onward |
| Waiver trips in that period | 254 | 99 |
| Waiver trips where a U.S.-flag vessel was available | 5 | 5 |
| Percentage of waiver trips with a U.S.-flag vessel available | 2.0% | 5.1% |
| Note: The two columns cover different periods, so they are not directly comparable. Balsa has data for all ATBs starting from July 1, 2026, and data for all Jones Act Tankers from April 27, 2026. | ||
CONCLUSION
Despite claims that Jones Act tankers and/or ATBs were available to complete waiver voyages, this analysis demonstrates that this was rarely the case. While Jones Act tankers and/or ATBs may have had some limited ability, it is unlikely that they had the time to complete the same voyages completed by waiver vessels, without it impacting their regular schedule. While there were some prolonged periods of inactivity for Jones Act tankers, these periods were connected to stays either in dry docks or ports associated with maintenance, indicating that these vessels were not available to complete any voyages. Additionally, the periods of idleness of the ATBs did not correlate with a high level of availability for waiver voyages, largely due to either the size or cargo type that the ATBs were capable of carrying.
Balsa’s research agrees with reports by at least one U.S. company, Kirby, which manages a fleet of Jones Act-eligible ATBs. According to Kirby’s CEO David Grzebinski, Kirby’s ATBs have been operating at the same capacity before and during the waiver period as they run on term contracts rather than the short-term spot/voyage contracts of the waiver vessels.
Other analyses have found substantially higher rates of availability. AMP’s figure of 87%, however, counts tankers, ATBs, and barges, and applies to a subset of 67 “qualifying” voyages from the initial waiver period. Availability is also defined differently. Reporting from Bloomberg shows that vessels MARAD has deemed “available” under the new approval process are often too small to carry the cargo in a single voyage within the required window. However, a vessel that cannot move the cargo when it is needed, or that would have to abandon existing contracted voyages to do so, is not a realistic substitute for the waiver vessel. More importantly, if the question is whether the waiver displaced U.S.-flag shipping, a vessel that remained fully employed on its regular schedule has lost no business. With a definition requiring that a vessel be able to complete the waiver voyage as described while maintaining its contracted schedule, it becomes clear that Jones Act tankers and ATBs were rarely available. This is consistent with Balsa’s finding that Jones Act tanker routes did not change during the waiver period.